Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Badger, W W and Mulligan, D E (1995) Rationale and Benefits Associated with International Alliances. Journal of Construction Engineering and Management, 121(01), 100–11.

Basha, I M, Gab-Allah, A A and Amer, M I (1995) Construction of Ameria Caisson in Egypt. Journal of Construction Engineering and Management, 121(01), 13–19.

Boles, W W, Maxwell, D A, Scott, W D, Heermann, P D, Yarborough, T and Underwood, J (1995) Construction Automation and Robotics—Pathway to Implementation. Journal of Construction Engineering and Management, 121(01), 143–52.

Chao, L and Skibniewski, M J (1995) Neural Network Method of Estimating Construction Technology Acceptability. Journal of Construction Engineering and Management, 121(01), 130–42.

Christian, J and Hachey, D (1995) Effects of Delay Times on Production Rates in Construction. Journal of Construction Engineering and Management, 121(01), 20–26.

Everett, J G and Thompson, W S (1995) Experience Modification Rating for Workers' Compensation Insurance. Journal of Construction Engineering and Management, 121(01), 66–79.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1995)121:1(66)
  • Abstract:
    Most employers regard workers' compensation insurance (WCI) as an outrageously expensive, but necessary cost of doing business. One of the objectives of WCI, to provide incentives for employers to improve safety performance, has been lost in the complex method used to calculate WCI premiums. Few employers and few insurance agents understand the process. This paper explains how WCI Standard Premiums are calculated using manual rates, payroll, and an experience modification rating. Manual rates help predict loss rates for different work classifications, payroll gives an indication of risk exposure, and an experience modification rating compares an individual employer's actual loss experience to its expected record. This paper shows that employers with WCI are really self-insuring for most losses and ultimately pay for their own injuries. The paper shows how several small losses cost far more than one severe loss, how employers who try to save money by reporting incorrect work classifications may end up paying more, and why using the experience modification rating to compare the safety performance of different employers is not valid. Employers who understand how their WCI premiums are calculated will have far more incentive to improve safety, and will be better prepared to negotiate savings when purchasing WCI.

Fisher, D J, O'Neill, M W and Contreras, J C (1995) DS^2: Drilled Shaft Decision Support System. Journal of Construction Engineering and Management, 121(01), 86–94.

Garsden, B R (1995) Postconstruction Evaluation. Journal of Construction Engineering and Management, 121(01), 37–42.

Jaraiedi, M, Plummer, R W and Aber, M S (1995) Incentive/Disincentive Guidelines for Highway Construction Contracts. Journal of Construction Engineering and Management, 121(01), 112–20.

Kibert, C J and Coble, R J (1995) Integrating Safety and Environmental Regulation of Construction Industry. Journal of Construction Engineering and Management, 121(01), 95–99.

Maloney, W F and McFillen, J M (1995) Job Characteristics: Union-Nonunion Differences. Journal of Construction Engineering and Management, 121(01), 43–54.

Mayo, R E and Liu, G (1995) Reform Agenda of Chinese Construction Industry. Journal of Construction Engineering and Management, 121(01), 80–85.

Navon, R (1995) Economic Benefits of Lightweight versus Conventional Construction Methods. Journal of Construction Engineering and Management, 121(01), 27–36.

Thomas, H R, Smith, G R and Cummings, D J (1995) Have I Reached Substantial Completion?. Journal of Construction Engineering and Management, 121(01), 121–9.

Thomas, H R, Smith, G R and Wirsching, S M (1995) Understanding Defective Specifications. Journal of Construction Engineering and Management, 121(01), 55–65.

Varghese, K and O'Connor, J T (1995) Routing Large Vehicles on Industrial Construction Sites. Journal of Construction Engineering and Management, 121(01), 1–12.